Allentown Railroad

From TrainSpottingWorld, for Rail fans everywhere
Allentown Railroad
Locale Pennsylvania
Dates of operation 1870December 31 1945
Successor line Reading Company
Track gauge ft 8½ in (1435 mm) (standard gauge)
Headquarters Reading

The Allentown Railroad was a rail line proposed in the 1850s to connect the Central Railroad of New Jersey at Allentown with the Pennsylvania Railroad's main line across the Allegheny Mountains. Through grading was almost entirely finished, most of the railroad never saw service. The small portion that did became a branchline of the Reading Company from Topton to Kutztown.

Origins

The CNJ had reached Phillipsburg in 1852, on the outskirts of the Lehigh Valley, and anticipated extension to Allentown. If a direct route could be built from Allentown to the Susquehanna, western traffic could reach New York faster by this route than by detouring through Philadelphia and coming north over the Camden and Amboy Railroad.

Such a route would run parallel to the mountains in the region, and a lateral coal railroad already extended west from the Susquehanna. The Dauphin and Schuylkill Railroad connected with the PRR at Rockville (where their main line crossed the Susquehanna), ran north along the river to Dauphin, and turned northeast to run up Stony Valley to the Rausch Gap coal mines. It proved to be a willing partner in the plan.

Construction of route

The D&S and CNJ jointly procured a charter, issued April 19, 1853 for the Allentown Railroad, which would construct the first segment of the route. It would run from Allentown to the Reading main line between Auburn and Port Clinton, with a branch into Kutztown. The Dauphin & Susquehanna had charter rights to connect with any rail line in Schuylkill County, and it began building an extension of its line, starting from the Reading at Auburn and driving westward. By November 4 1853, the new line of the D&S was open from Auburn to Pine Grove, following Bear Creek to its headwaters and then dropping down Lower Little Swatara Creek. Work continued on the more difficult middle segment, which required heavier grading to climb along the slopes of Second Mountain and enter Stony Valley at Fishing Creek Gap.

On March 13, 1854, a second railroad, the Auburn and Port Clinton Railroad, was chartered for the project. This would connect the D&S at Auburn with the Allentown RR at Port Clinton, running parallel to the Reading main line along the Schuylkill River. On April 13 1854, the charters of both the Allentown and the A&PC railroads were amended to allow them to merge with the Lehigh Valley Railroad, then building down through Allentown towards Easton (across the river from Phillipsburg). The line from Pine Grove to Rausch Gap was completed in June, and the D&S ran its first through train.

In 1855, work began in earnest on the Allentown Railroad itself. The route chosen left Allentown in a southwesterly direction, passing through Dorneyville, Wescosville, Trexlertown, and Breinigsville. Ducking through Topton, it ran directly through Kutztown and followed Sacony Creek through the hills to Virginville. From thence it followed small streams west and north to Windsor Castle, site of the line's one tunnel. It was to be 1100 feet long, with rubble masonry portals. Leaving the tunnel, it would skirt the edges of Hamburg and push through the gorge of the Schuylkill to reach Port Clinton. By July 1856, the CNJ was prepared to abandon the project in favor of a rival route, via Reading. However, the other investors pressed on. The Auburn & Port Clinton was merged into the Allentown Railroad on January 1 1857. The Panic of 1857, however, brought work to a halt. The D&S was foreclosed and reorganized on April 1, 1859 as the Schuylkill and Susquehanna Railroad, under control of the Reading. On May 11 1859, the East Pennsylvania Railroad opened, connecting Allentown and Reading. From Reading, traffic could either pass north to Auburn and thence over the Schuylkill and Susquehanna, or west over the Lebanon Valley Railroad to Harrisburg. The distance cut off by the direct route from Port Clinton to Allentown was minimal, so when the Reading gained control of the Allentown RR on July 12 1860, it saw no reason to complete it.

Reading and later operation

The Reading briefly considered a revival of the project in 1869, but on May 1 1869, it obtained a least of the East Penn. This road would become a permanent part of the Reading system, and the Allentown Railroad's plants were negated forever. The Reading did lay rail on a small segment of the grade from the East Penn at Topton to reach Kutztown, a branch opened on January 10 1870 or 1871. The Allentown Railroad remained a corporate entity in the Reading system until it was merged in on December 31 1945. The line survived the bankruptcy and breakup of the Reading: it is now owned by the Kutztown Transportation Authority and operated by Penn Eastern Rail Lines, Inc.

A portion of the grade from Trexlertown to Breinigsville was also used by the Catasauqua and Fogelsville Railroad to build a branch to local orefields. This line, too, eventually came under Reading control.

Relics

Grading of the line was nearly complete by 1857, and many traces still remain today. Bridge abutments for the crossing of the Little Lehigh Creek were dismantled by Works Project Administration crews in the 1930s. A portion of the grading can still be seen on the southeast side of the intersection of Route 229 and Route 222, near Dorney Park, and on the north side of Route 222 between Grange and Krocks Roads. Turning Leaf Trail in Trexlertown and most of Wentz Road in Breinigsville were built on the part of the grade used by the Catasauqua & Fogelsville. Beyond the end of rail in Kutztown, the grade is intermittently intact along the Sacony, and almost continuous from Virginville to Hamburg.

External links

References

  • Allentown RR papers from the Reading Company archive at the Hagley Library
  • Taber, Thomas T., III (1987). Railroads of Pennsylvania Encyclopedia and Atlas. Thomas T. Taber III. ISBN 0-9603398-5-X.